Sign In | Join Free | My ismap.com
ismap.com
QINGDAO HKJ PACKAGING MACHINERY CO., LTD
Save Labor Costs,Easy Operation,High Efficiency!
Home > Precision Seamless Steel Pipe >

Customized Precision Seamless Steel Pipe Bushing For Automotive Pipeline System

QINGDAO HKJ PACKAGING MACHINERY CO., LTD
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment

Customized Precision Seamless Steel Pipe Bushing For Automotive Pipeline System

Brand Name : HKJ
Model Number : HKJ-Lena
Certification : IATF16949
Place of Origin : Qingdao, China
MOQ : 5 Tons
Price : USD620-650/TON
Payment Terms : L/C, T/T, Western Union
Supply Ability : 10000 Tons/Year
Delivery Time : 22-30 work days
Packaging Details : Fully Covered by PP Woven Sheet
Model No. : customized
Origin : China
HS Code : 73049000
Contact Now

Bushing Tube for Automotive Chassis/Engine mount bushing Motor casing



1.Implementation of standards:DIN2391-1, EN10305-1, GB8163, ASTMA179, ASTMA192 etc

2.Material:Steel No.10#, 20#, 35#, 45#, St37, St45, St52, 40cr, 16Mn, C45 etc

3.Specification:
A.Cold Rolled Precision Seamless Tube Od 5-120mm
B.Wall Thicknes From 0.8-15mm
C.Tube Length Fixed or Random

4.Certificate:SGS, TUV SUD, BV, ISO 9001-2011

5.Packing:
A..With Steel Belt in Bundle
B.Oiled and Packing by Pvc Film or Plastic Bags



DELIVERY CONDITIONS

The tubes can be produced in the following delivery conditions:
BK (+C) Cold finished/hard (cold finished as drawn).
No heat treatment after the last cold forming process.

BKW (+LC) Cold finished/soft (lightly cold worked)
After the last heat treatment there is a light finishing pass (cold drawing).

BKS (+SR) Cold finished/stress relieve annealed.
After the final cold forming process the tubes are stress relieve annealed.

GBK (+A) Annealed.
After the final cold forming process the tubes are annealed in a controlled atmosphere.

NBK (+N) Normalized.(Mainly focus on)
After the final cold forming process the tubes are annealed above the upper transformation point in a controlled atmosphere.


Preicision Seamless Tube Size List

OD (mm)Thickness (mm)OD (mm)Thickness (mm)OD (mm)Thickness (mm)OD (mm)Thickness (mm)
Φ13.11.5-3Φ35.51.5-7Φ46.11.5-10Φ931.5-15
Φ19.251.5-5Φ35.91.5-7Φ47.81.5-10Φ19-Φ1211.5-15
Φ221.5-5Φ36.61.5-7Φ49.21.5-10
Φ22.21.5-5Φ381.5-8Φ49.51.5-10
Φ251.5-6Φ38.41.5-8Φ52.31.5-10
Φ26.31.5-6Φ401.5-10Φ53.81.5-10
Φ271.5-6Φ40.21.5-10Φ571.5-10
Φ281.5-6Φ40.91.5-10Φ591.5-10
Φ301.5-6Φ41.31.5-10Φ601.5-11
Φ30.251.5-6Φ41.61.5-10Φ62.51.5-11
Φ30.91.5-6Φ421.5-10Φ741.5-11
Φ311.5-7Φ431.5-10Φ751.5-11
Φ321.5-7Φ44.51.5-10Φ761.5-11
Φ351.5-7Φ45.81.5-10Φ891.5-15

FAQ:
Q1:How long time is the shortest delivery?
A1:For stock material,the delivery time is just 3-5 working days.
And for customized product,it will takes 25-35 working days based on different size and quantity.
Q2:Can you supply the sample?Does it free or not?
A2:For partial materials,we can supply the sample free
If you want to know more details,please contact our sales online.
Q3:What's the terms of payment?
A3:We can accept T/T,100% irrevocable LC at sight,Western Union,etc,
Q4.How can we get your price ?
We need below information to quote for you:
1. Product Name
2. Standard
3. Material Grade (Chemical Composition)
4. Dimension
5. Quantity
6. The Drawing for Special Parts


Our Customers:




Product Tags:

alloy steel seamless tubes

      

mechanical steel tubing

      
China Customized Inflatable Bumper Ball Game Bubble Adult Grass CE supplier

Customized Precision Seamless Steel Pipe Bushing For Automotive Pipeline System Images

Inquiry Cart 0
Send your message to this supplier
 
From:
To: QINGDAO HKJ PACKAGING MACHINERY CO., LTD
Subject:
Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0